Pull/Kanban Systems - with interactive mixed model simulation game

Introduction

Kanban/Pull systems are one of the option to connect process in lean value stream design. In this training we will teach the different ways to implement pull/kanban systems. We discuss the principles, methodology to set-up kanban systems and practical aspects for implementation:

  • How many kanban cards do I need?
  • Which kanban system do I need?
  • How does a Kanban wall work and how to design it?
  • Is Kanban only possible in a repetitive environment?
  • What should be the size of a standard container quantity?

At the end of the session participants will have a better and deeper understanding how to design and integrate a Kanban pull system in a production flow. We will use an own developed LEGO simulation game to create a practical and visual learning environment in which participants can see the concepts in action in a very hands-on way.

Following aspects will be covered in the simulation game:

  • Determining EPEI (every part every interval) – replenishment frequencies.
  • Design & calculation of a kanban supermarket.
  • Design and use of a kanban wall.
  • One card/ two card kanban system/two bin system.

What can I do with this training?

At the end of the session participants will have a better and deeper understanding how to design and integrate a Kanban pull system in a production flow.

Target Audience

Lean managers, operations managers, engineers.

Prerequisites

Lean Basics or Lean Managers training.

Certification

Participants will receive a certificate of attendance.

Why follow a training with us?

 

Registration (online)

Registration Form (pdf)

Language
English/Dutch

Pricing
Please look at our 
current Special Offers here!

 

Module Price €**
1  

** All prices are in  € and exclusive VAT (21%).

Dates & Location

For our open training schedule in Belgium see www.lean-academy.be

Our Instructor
 Raf Aernouts (Bogaerts Greenhouse Logistics)
Modules

Program

  • Basic principle of pull systems.
  • Types of pull/kanban systems: characteristics and when/how to use.
  • Data collection and calculating/sizing the pull system.
  • Implementation aspects: start-up, audit, improve.
  • Hands-on mixed model LEGO game with case study calculation, simulation and discussion.